Note- In the case of a d ual power feed, connect the power cords in their original positions by
referringto th ere cord that you made before the start of maintenance.
XSCF> diagxbu -y -b 00 -p 02
XSCF> showlogs error
Note- In the case of a d ual power feed, connect the power cords in their original positions by
referringto th ere cord that you made before the start of maintenance.
2. Returnto the operation of theXSCF firmware replacefru command to confirm
thatthe chassis has been incorporated into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3. Executethe diagxbu command to diagnose the crossbar cables.
Diagnosis is performed when the system board of the chassis connected with the
crossbar cables is incorporated into the physical partition, and the physical
partitionis powered on.
Theex ample below specifies the following:
00:BB-ID ofthe c hassis to start the diagnosis
02: PPAR-ID of the destination where the chassis to start the diagnosis is
connected (You can specify only one of these.)
4. Executethe showlogs command to confirm that the system is operating
normally.
For details, see "3.3.5 Checking log information."
5.
Incorporateth ec hassis, in which the CPU memoryun it requiring maintenance
ismounted, into the physical partition.
For details, see "6.2 Incorporatinga Chassis into a Physical Partition."
6. Closethe rack door.
9.6.2 Inactive/Cold maintenance
1. Connect all the power cords to the PSU backplane unit of the chassis
requiringmaintenance.
For details, see "6.5.1 Installingthe power cord."
2. Returnto the operation of theXSCF firmware replacefru command to confirm
thatthe chassis has been incorporated into the system.
FujitsuM10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual December 2013188