A
Note- Place the removed operation panel on a grounded antistatic ESD mat.
Figure15-6 Cables and screws of the operation panel
3. Pullthe operation panel forward to remove it.
15.5 Installing the Operation PanelThissectio n describes the procedure for installing the operation panel.
15.5.1 Installing the operation panel
1. Set the BB-ID of the operation panel to the value prior to the start of
maintenance.
2. Place the operation panel in the mounting position and then tigh ten one
screw.
FujitsuM10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual ・December 2013290