Note- Reco nnect the cables of the external interface in their original positions by referring to
thenotes that you made prior to the start of maintenance.
Note- See the procedure for system-stopped maintenance for inactive/cold maintenance in a
single-chassisco nfiguration.
Note- Use the DR of the system board on a physical partition for active/cold maintenance.
Forthe XCP an d Oracle VM Server for SPARC/SRU versions that correspond to the DR, see
thelatest Produc t Notes.
Note- Active/co ld maintenance can be performed only for a building block configuration.
Note- In the case of a d ual power feed, connect the power cords in their original positions by
referringto th ere cord that you made before the start of maintenance.
Crossbarcable
XSCFBB control cable
XSCFDUAL control cable
LANc able
12. Liftthe cable support to fix i t.
For details, see "6.5.2 Fixing the cable support."
14.6 Restoring the System
Thissectio n describes the procedure for restoring the system after installing the PSU
backplane unit. The restoration procedure differs depending on the maintenance
typea s follows:
Active/Cold maintenance
Inactive/Cold maintenance
System-stopped maintenance

14.6.1 Active/Cold maintenance

1. Connect all the power cords to the PSU backplane unit of the chassis
requiringmaintenance.
For details, see "6.5.1 Installing the power cord."
2. Returnto the operation of theXSCF firmware replacefru command to confirm
thatthe chassis has been incorporated into the system.
FujitsuM10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual December 2013276