INTERLOCK |
|
Electron Gun | The Gun cable is now interlocked with a momentary switch. |
| If the cover at the top of the electron gun is removed to |
| disconnect gun cable, the High Voltage applied to the electron |
| gun is shut off. This switch can be overridden for service. |
| However, if the cable is replaced the service override is removed. |
Ion Pump | The ion pump cover at the back of the electron optical column |
| has a safety interlock switch. If the cover is removed, the High |
| Voltage supplied to the ion pumps is shut off and lamps in the |
| RESET switches for ion pumps located on the evacuation control |
| panel will go off. For service the switches can be overridden, |
| but as soon as the ion pump cover is put again, the service |
| override is removed. |
Other High Voltages | High voltage power supply for photo multipliers and electrodes |
| are placed inside of a box located at the behind of the specimen |
| chamber. The cover of the box has a safety interlock switch. If |
| the cover is removed, the High Voltage supplied to the photo |
| multipliers and electrodes is shut off. For service the switches |
| can be overridden, but as soon as the cover is put again, the |
| interlock is functional. |
Baking power supply | Baking heater power supply connectors are placed at the right |
| side of the ion pumps cover. To connect heater connectors, the |
| box cover of the connector must be removed. The box cover of |
| the connector has a safety interlock switch. The baking power is |
| shut off when the cover is removed. After connecting connectors, |
| put the cover again. The baking power then becomes applicable. |
Unit power supply | Four side covers of the Main unit have safety interlock switches |
| one for each. If one of the side covers is removed, AC power |
| supply for the Main unit (for evacuation system, ion pump power |
| supply and stage controller) will be shut off. The switches can be |
| overridden for service. However, if the covers are put again, the |
| service override is removed. |
| The interlock location is shown in fig |
Protection for Earthquakes | It is recommended that the protection for movement of Main unit |
| and Display unit during earthquakes is to be provided by user as |
| shown in figures |
Gravity location of units | The gravity location of Main and Display unit are shown in fig S- |
| 9 through |
| It is recommended that the |
| provided by user. Figure |
| leakage detector. |
SAFETY - 17