Line Telephones, modem pooling, and Voice Mail’

traffic. Heavier traffic may require additional MFR-EA ETUs be installed even though the amount of SLTs installed are low.

Table 200-l Recommended MFR-EA ETU Quantities

SINGLE

LINE

TELEPHONES

 

MFR.EA

ETUs

 

CONNECTED

RECOMMENDED

 

 

 

 

I

 

 

 

 

0

 

0

 

i

 

 

 

 

 

 

 

l-20

I

1

 

 

 

 

 

 

 

 

21-40

 

2

I

 

 

41-60

 

3

 

 

 

61-76

I

4

I

 

 

 

j _,-

 

 

To determine

the quantity

of interface

ETUs

required,

refer to Table 200-2.

 

 

 

For your reference, interface slot and port assignment numbers are shown in Figure 200-2.

3. Common ETUs.

a.A CPU-E( ) ETU must be installed in the CPU slot of the ESE-32B-1 CCU.

b.TSW-E, or TSW-EB ETU must be installed in the TSW slot in the ESE-32B-1 CCU.

c.MMC-E ETU must be installed in the MMC slot in each ESE-32E-1 CCU.

d.SMDR-E ETU can be installed in any option (OP) slot in either the ESE-32B-1 or ESE-32E-1 ecus.

e.LCR-E ETU can be installed in any option (OP) slot in either the ESE-32B-1 or ESE-32E-1 ecus.

 

m

-;I

1

 

0

0

 

/

s

 

S

P

P

I ‘:::,I 1

CCU

z;

G

 

2

4

7 --ii

0

0

 

/

S

 

S

P

P

 

ecu

U

 

G

 

2

 

3

-

 

 

 

-

 

/

P

 

R

0

0

 

S

 

S

P

P

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

0

 

 

 

 

 

 

P

 

 

 

 

 

 

-1

 

 

 

 

 

 

 

8”

ND-20292

CHAPTER 2

APRIL, 1990

4.CCUs, PSUs, and RSGs

a. An ESE-32B-1 CCU is always required.

b.ESE-32E-1 CCU:

Divide the total number of interface ETUs by 8. If the result is not a whole number, round it up to the next higher whole number. The whole number minus one is the quantity of ESE-32E-1 CCUs required.

NOTE: If total number of interface’ ETUs is 8 and SMDR-E and LCR-E ETUs are installed, an ESE-32E-1 CCU is required.

c.PSE-AD-l, PSE-DD-1 PSUs:

One PSE-AD-1 or PSE-DD-1 PSU is required for each CCU. The quantity of ESE-32B-1 CCU and ESE-32E-1 CCU is equal to the total of PSUs

required. PSE-AD-( ) and PSE-DD-( ) PSUs should not be installed in the same system.

Operational integrety of the system may be degraded ifpower is lost to the individual CCUs.

d.RSG-E Unit:

An RSG-E Unit is required for each (or two adjacent) CCU in which SLI-E( ) and VMI-E ETUs are installed (Refer to Table 200-3).

Table 200-3

Recommended RSG-E Unit Quantities

SINGLE

LINE

TELEPHONES

RSG-E UNITS

 

CONNECTED

RECOMMENDED

 

 

0

0

 

 

l-24

1

 

 

25-48

2

 

 

49-76

3

109105

110106

1271 123 1119 I115 1 111 107

112 108

 

 

 

77/

73

 

 

 

78

74

 

 

 

791;

75

 

 

 

80%'

76

 

 

 

45

41

 

 

 

46

42

 

 

 

47

43

 

 

 

48

44

 

 

 

13

09

 

 

 

14

10

321

**

124

15

11

16

12

 

 

 

Figure 200-2 Interface Slot and Port Assignment Numbers

200-3

Page 35
Image 35
NEC nd-20292 manual 200-3, To determine, An ESE-32B-1 CCU is always required ESE-32E-1 CCU, PSE-AD-l, PSE-DD-1 PSUs