ProSafe M4100 and M7100 Managed Switches

A screen similar to the following displays.

b.Scroll down and select 1/0/1 and 1/0/2 check boxes.

c.In the PVID (1 to 4093) field, enter 10.

d.Click Apply to save the settings.

e.Select Switching > VLAN > Advanced > Port PVID Configuraton. A screen similar to the following displays.

f.Scroll down and select the 1/0/3 check box.

g.In the PVID (1 to 4093) field, enter 20.

h.Click Apply to save the settings.

72 Chapter 5. VLAN Routing

Page 72
Image 72
NETGEAR M7100, M4100 manual Screen similar to the following displays, Scroll down and select 1/0/1 and 1/0/2 check boxes