Installation summary

Page 39 of 488

 

 

 

 

 

Table 1

 

 

List of required installation tasks (Part 2 of 2)

 

 

 

 

 

 

Task

 

Go to page

 

 

 

 

 

Installing Line cards and cross-connecting

 

383

 

telephones

 

 

 

 

 

 

 

Installing and configuring IP Phones

 

395

 

 

 

 

 

Installing and cross-connecting a trunk card

 

289

 

 

 

 

 

Installing and cross-connecting a

 

441

 

Power Fail Transfer Unit

 

 

 

 

 

 

 

Installing and cross-connecting

 

455

 

an external alarm from a PFTU

 

 

 

 

 

 

 

Configuring MG 1000T survivability and alternate

 

461

 

primary controller

 

 

 

 

 

 

 

Basic system telephony configuration

 

477

 

 

 

 

 

Configuring IP Peer Networking and

 

485

 

managing the Gatekeeper database

 

 

 

 

 

 

Communication Server 1000E Installation and Configuration

Page 39
Image 39
Nortel Networks 1000E warranty List of required installation tasks Part 2 Task Go to