Nortel Networks 1000E warranty Switch call processing from Call Server, To Call Server

Models: 1000E

1 490
Download 490 pages 31.09 Kb
Page 149
Image 149

Installing software on the CS 1000E Page 149 of 488

7Check applications (CallPilot, Symposium, and so on)

End of Procedure

Switch call processing

Procedure 30

Switching call processing

LD 135

Load program

SCPU

Switch call processing from Call Server 1

 

to Call Server 0

 

 

 

Call Server 0 is now the active call processor.

 

 

 

 

 

 

End of Procedure

 

 

 

 

Procedure 31

Testing Call Server 1

From active Call Server 0, perform these tests on Call Server 1:

1Perform a redundancy sanity test:

LD 135

Load program

STAT CPU Get status of CPU and memory

TEST CPU

Test the CPU

2Check the LCD states.

a.Perform a visual check of the LCDs.

b.Test LCDs:

LD 135

Load program

TEST LCDs

Test LCDs

DSPL ALL

 

c.Check that the LCD display matches the software check.

Communication Server 1000E Installation and Configuration

Page 149
Image 149
Nortel Networks 1000E warranty Switch call processing from Call Server, To Call Server, Procedure Switching call processing