Nortel Networks 1000E warranty Verifying Call Server 0 is active, Make the system redundant

Models: 1000E

1 490
Download 490 pages 31.09 Kb
Page 142
Image 142

Page 142 of 488 Installing software on the CS 1000E

Verifying Call Server 0 is active

Use the following commands to verify that Call Server 0 is active.

LD 135

Load program

STAT CPU

Get the status of the CPUs

CFN

 

Make the system redundant

At this point, Core/Net 0 is ready to be synchronized with Core/Net 1.

Procedure 28

Making the system redundant

1Check to see if the LAN 1 and LAN 2 cables are attached. If not, attach the LAN 1 and LAN 2 cables to the CP PIV faceplate connectors on Call Server 0 and Call Server 1.

2Once the synchronization of memories and drives is complete, STAT the CPU and verify that the CPUs are in a true redundant state.

LD 135

STAT CPU Get status of CPU and memory

****Exit the program

553-3041-210 Standard 4.00 September 2007

Page 142
Image 142
Nortel Networks 1000E Verifying Call Server 0 is active, Make the system redundant, Procedure Making the system redundant