Page 94 of 488 Installing system grounds

Figure 26

NTBK80 Ground Bar

End of Procedure

Follow Procedure 7 to install an NTDU6201 Ground Bar.

Procedure 7

Installing an NTDU6201 Ground Bar

1Place the NTDU6201 Ground Bar near the equipment.

Note: The ground bar is a bridging point for ground wires from up to 48 components.

553-3041-210 Standard 4.00 September 2007

Page 94
Image 94
Nortel Networks 1000E warranty Follow Procedure 7 to install an NTDU6201 Ground Bar, NTBK80 Ground Bar End of Procedure