chilled water flowing. If the entering CHILLED WATER/BRINE TEMPERATURE increases
above the ICE BUILD SETPO I NT plus the RECYCLE DELTA T value, the compressor wi ll
restart and control the CHILLED WATER/BRINE TEMPERATURE to the ICE BUILD
SETPOINT.
Temperature Control During Ice Build
During ice build, the ca pac i ty control algorithm us es t he WATER/BRINE CONTR OL POINT
minus 5 F (2.7 C) to control the LEAVING CHILLED WATER temperature. The ECW OPTION
and any temperature res et option are ignored duri ng ice build. The 20 mA DEMA ND LI MIT
OPTION is also ignored dur i ng ice build.
Termination of Ice Build
Ice build termination oc c u rs under the following con ditions:
1. Ice Build Time Sched ule — When the Ice Build Time Sche dule transitions to
UNOCCUPIED, ice bu ild operation shall termina te.
2. ECW TEMPERATURE — Termination of compressor operation, based on temperature,
shall occur if the ICE BUILD TERMINATION is set to the ICE BUILD TERMINATION TEMP
option and the ENTERI NG CHILLED WATER temperat ur e is less than the ICE BUILD
SETPOINT. If the ICE BUILD RECYCLE OPTION is set to ENABLE, a recycle shutdown
occurs and recycle start-up shall be based on LEAVING CHILLED WATER temperature
being greater than the WATER/BRINE CONTROL P OI NT plus RECYCLE DELTA T.