Before Initial Start-Up

Job Data Required

list of applicable des ign temperatures and pres s ur es ( pr o duct data submittal)
machine certified dr aw ings
starting equipment det ails and wiring diagrams
diagrams and instruct io ns for special control s or opt ions
17/19EX Instal lation Instructions
pumpout unit instruc ti ons

Equipment Required

mechanic’s tools (ref rigeration)
digital volt-ohmmeter (DVM)
clamp-on ammeter
electronic leak detect or
absolute pressure man ometer or wet-bulb vacuum in dicator (Figure 26)
500 v insulation tester ( m ego hmmeter) for compre s s or m ot ors with nameplate volt-
age of 600 v or less, or a 5000-v insulation tester for compressor motor rated above
600 v

Using the Utility Vessel and Pumpout System

Refer to Pumpout and Refri gerant Transfer Proce dur e s section for: pumpout system
preparation, re frigerant transfe r, and machine evacuation.