Contents
Modify Equipment Configuration If Necessary
Check Voltage Supply
Perform an Automated Control Test
Check Pumpout System Controls and Optional Pumpout Compressor
High Altitude Locations
Charge Refrigerant into Ma chine
Trimming Refrigerant Charge
Initial Start-Up
Preparation
Manual Operation of the Guide Vanes
Dry Run to Test Start-Up Sequence
Check Rotation (Open-Dr ive Motor)
Check Rotation (Hermeti c Motor)
If Rotation Is Proper
If the Motor Rotation Is N ot Clockwise