INITIAL START-UPCHECKLIST FOR17/19EX CENTRIFUGAL LIQUID CHILLER

(Remove and use for job file.)

MACHINE INFORMATION:

NAME JOB NO.
ADDRESS MODEL
CITY STATE ZIP S/N
DESIGN CONDITIONS:
TONS BRINE FLOW
RATE TEMPERATURE
IN TEMPERATURE
OUT PRESSURE
DROP PASS SUCTION
TEMPERATURE CONDENSER
TEMPERATURE
COOLER ******
CONDENSER ******
COMPRESSOR: Volts RLA OLTA
STARTER: Mfg Type
OIL PUMP: Volts RLA OLTA
REFRIGERANT: Charge Lbs
CARRIER OBLIGATIONS: Assemble ...............YesMNoM
Leak Test ...............YesMNoM
Dehydrate ...............YesMNoM
Charging ................YesMNoM
Alignment ...............YesMNoM
Operating Instructions Hrs.

START-UPTO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP

INSTRUCTIONS

JOB DATAREQUIRED:
1. Machine Installation Instructions .........................YesMNoM
2. Machine Assembly, Wiring and Piping Diagrams ............YesMNoM
3. Starting Equipment Details and Wiring Diagrams ............YesMNoM
4. Applicable Design Data (see above) ......................YesMNoM
5. Diagrams and Instructions for Special Controls .............YesMNoM
INITIAL MACHINE PRESSURE:
YES NO
WasMachine Tight?
If Not, Were Leaks Corrected?
WasMachine Dehydrated After Repairs?
CHECK COMPRESSOR OIL LEVELAND RECORD: ADD OIL: YesMNo M
Amount:
RECORD PRESSURE DROPS: Cooler Condenser
CHARGE REFRIGERANT: Initial Charge Final ChargeAfter Trim
Manufacturerreserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2 2
Tab 5a 5d PC211 CatalogNo. 531-715 Printedin U.S.A. Form 17/19EX-1SS Pg CL-1 9-95 Replaces: 19EX-1SS