Final Alignment
The procedures and tole rance requirements f or fin al alignment are the same as those de-
scribed in the Near Fi nal Alignment sec t ion. Final alignment is per f ormed just prior to grou ti ng
and machine hot check. A ll piping, including wat er and steam, must be com pleted, but the water
and refrigerant charges need n ot be in plac e.
Hot Alignment Check
General
When all machine componen ts have reached opera ting temperature (af te r ru nni ng near full
load for from 4 to 8 hours), a hot alignment check must be made. Hot alignment check may be
made with couplings ass em b led or disassembled.