3-8 Setting Up Your Server

No. Item Q'ty Remarks
1 Front bezel 1
2 Slide rail assembly (L) 1 "L" is stamped on the rail.
3 Slide rail assembly (R) 1 "R" is stamped on the rail.
4 Cable arm 1
5 Adapter bracket 1
6 Handle (L) 1
7 Handle (R) 1
8 Arm bracket (700) 1
9 Arm bracket (900) 1
Use one according to the distance between the
front and rear vertical mounting rails of your rack
cabinet.
10 Arm stopper 1
11 Templa te 1
12 Tie-wrap 6 25 cm long.
13 Lock spring 1 Used to fix the power cords.
14 Screw-A 6 CPIMSx#8-32x6
15 Screw-B 7 CPIMSx6-32x8
16 Screw-C 14 CBIMS×5×10×3GF
17 Screw-D 6 PL-CPIMSx4x8x15BF
18 Washer-A 12 M5-14 (Assembled with Screw-C.)
19 Washer-B 4 PIWAx5x15BF (Assembled with Screw-D.)
Required Tools

#2 Phillips screwdriver and flat tip screwdriver are recommended for assembling the rack-mount

system.