SECTION 4

Preparations for Communications

This section describes the settings required for starting communications. These basic settings are required for both data links function and the message service. Carry out the settings described here before turning on power to the Controller Link Unit.

4-1 CS-series Controller Link Units

86

4-1-1

Overview

86

4-1-2

Unit Number

86

4-1-3

Node Addresses

87

4-1-4

Baud Rates

88

4-1-5

Terminating Resistance

89

4-2 CJ-series Controller Link Units

89

4-2-1

Overview

90

4-2-2

Unit Number

90

4-2-3

Node Addresses

91

4-2-4

Baud Rates

92

4-2-5

Terminating Resistance

92

4-3 C200HX/HG/HE Controller Link Units

93

4-3-1

Overview

94

4-3-2

Node Addresses

94

4-3-3 Baud Rates and Operating Levels

95

4-3-4

Terminating Resistance

96

4-4 CVM1 and CV-series Controller Link Units

97

4-4-1

Overview

97

4-4-2

Unit Number

98

4-4-3

Node Addresses

98

4-4-4

Baud Rates

99

4-4-5

Terminating Resistance

99

4-5 CQM1H-series Controller Link Units

100

4-5-1

Overview

100

4-5-2

Node Addresses

101

4-5-3

Baud Rates

101

4-5-4

Terminating Resistance

102

4-6 Repeater Units

102

4-6-1

Wire-to-Wire Repeater Unit

103

4-6-2

Baud Rates

103

4-6-3

Terminating Resistance

104

85

Page 108
Image 108
Omron CVM1-CLK21, CS1W-RPT01, CJ1W-CLK21-V1, C200HW-CLK21, CQM1H-CLK21, CS1W-CLK21-V1 Preparations for Communications