Omron CVM1-CLK21, CS1W-RPT01 Message Delay Times, 1 CS/CJ-series, CVM1, and CV-series PLCs

Models: CS1W-RPT01 CJ1W-CLK21-V1 CVM1-CLK21 CQM1H-CLK21 CS1W-CLK21-V1 C200HW-CLK21

1 401
Download 401 pages 33.98 Kb
Page 288
Image 288

Message Delay Times

Section 8-4

In this case, the data processing time required for data exchange and the data transmission time are not negligible and need to be included in the calcula- tion. Each time can be determined as follows.

Data Processing Time (see page 254.)

0.0025 (8 + 16) 8 + 4.7 = 5.18 5.2 ms

Data Transmission Time

Data transmission time varies with the baud rate.

Baud rate

Data transmission time

 

 

 

2 Mbps

Number of data link words

0.008 ms

 

 

 

1 Mbps

Number of data link words

0.016 ms

 

 

 

500 Kbps

Number of data link words

0.032 ms

 

 

 

In this example, the number of data link words is (8 + 16) 8 = 192, so the data transmission time can be determined as follows:

0.008 (8 + 16) 8 = 1.536 1.5 ms

Assume that the sum of the instruction execution time and I/O refresh time for the PLCs at nodes #1 and #7 is 1 ms. The equation for minimum data link I/O response time is as follows:

Input ON delay

---

 

 

Instruction execution time + I/O refresh

1 ms

time for PLC at node #1

 

 

 

Data processing time

5.2 ms

 

 

Data link transmission time

1.5 ms

 

 

Data processing time

5.2 ms

 

 

Instruction execution time + I/O refresh

1 ms

time for PLC at node #7

 

 

 

Output ON delay

---

 

 

Total (data link I/O response time)

13.9 ms

 

 

Noise may increase I/O delays.

8-4

Message Delay Times

 

The two charts which follow indicate the sequence of processing which will

 

enable users to calculate the maximum delay time to be expected between

 

the time SEND(192) or RECV(193) is executed and the time the data is stored

 

in the destination or source node’s memory area, ready for use by other

 

instructions in the program.

8-4-1 CS/CJ-series, CVM1, and CV-series PLCs

SEND

The following diagram indicates the data flow which will yield the maximum

 

delay time from the time SEND(192)/SEND(90) is executed by the user pro-

 

gram to the time the Controller Link Unit stores the data in the destination

 

Unit’s memory.

265

Page 288
Image 288
Omron CVM1-CLK21, CS1W-RPT01 Message Delay Times, 1 CS/CJ-series, CVM1, and CV-series PLCs, Data Processing Time see