Polycom® CMA® System Conference Scheduling Overview

Some notes about bridge reassignment:

The bridge reassignment process only occurs when the system detects that a bridge is down. It does not occur if the system determines that a bridge does not have sufficient resources required to host the conference.

If the CMA system cannot find another bridge with the features and capacity needed to support a conference, the conference fails to start. The system does not attempt to modify the conference settings in any way. Instead, the system sends an email to notify the conference organizer of the failure.

The system will chain bridge reassignments. This means that if the next bridge to which the system assigns a conference is down at the time the system tries to start the conference, the system will try to reassign the conference again.

If the bridge to which the system reassigns a conference has ad hoc conferences on it, the CMA system is unaware of those conferences. The reassigned conference may fail to start if ad hoc conferences are consuming resources the CMA system expected to schedule. This is known behavior and is avoided by applying the best practice of not using bridges for both scheduled and ad hoc conferences.

Polycom, Inc.

47

Page 67
Image 67
Polycom 3725-77601-001H manual Polycom CMA System Conference Scheduling Overview