Siemens SITRANS FUS1010 NEMA-4X/ IP 65 manual Install Completed?

Models: SITRANS FUS1010 NEMA-4X/ IP 65

1 232
Download 232 pages 51.98 Kb
Page 66
Image 66

Section 2

1010NFM-3J

 

 

 

After transducers are properly mounted, the flow computer completes its Initial Makeup command and the [Install Completed?] menu cell appears.

To access the [Install Completed?] option list, press the <Right Arrow>.

Press <Down Arrow> and scroll to the [Install Completed?] menu cell and then press <ENT> (unless otherwise directed to do so by Controlotron’s Technical Service Department).

 

Siemens

2 Channel

[1] SITE1

 

 

 

Key [Install] after mounting transducers

 

 

 

 

 

 

 

 

Transducer Model

1011 Universal

 

 

 

Transducer Size

B3

 

 

 

Xdcr Mount Mode

Direct

 

 

 

Spacing Offset

Minimum

 

 

 

Number Index

4

 

 

 

Spacing Method

Track 1012TP

 

 

 

Ltn Value (in)

 

0.217

 

 

 

Install Completed?

No

 

 

 

Empty Pipe Set

Channel Not Setup

 

 

 

Zero Flow Adjust

Channel Not Setup

 

 

 

 

 

 

 

 

Pick/Install Xdcr

Press <ENT>. The [Install Completed?] menu cell will indicate [Yes] after the 1010 is successfully installed.

 

Siemens

2 Channel

[1] SITE1

 

 

 

Key [Install] after mounting transducers

 

 

 

 

 

 

 

 

Transducer Model

1011 Universal

 

 

 

Transducer Size

B3

 

 

 

Xdcr Mount Mode

Direct

 

 

 

Spacing Offset

 

Minimum

 

 

 

Number Index

 

4

 

 

 

Spacing Method

Track 1012TP

 

 

 

Ltn Value (in)

 

0.217

 

 

 

Install Completed?

Yes

 

 

 

Empty Pipe Set

 

Channel Not Setup

 

 

 

Zero Flow Adjust

Channel Not Setup

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pick/Install Xdcr

 

 

 

 

 

 

 

 

 

To complete the Install process proceed to page 2-27 and disregard the following paragraphs explaining the Force Transmit and Force Frequency diagnostic software routines.

NOTE: If the transducers have been installed successfully but the Estimated Vs (sonic veloc- ity) has been changed, the Pick/Install Xdcr menu cell [Install Completed?] option list will also display the [Transfer Install] function selection. The Transfer Install function allows the transducers to be optimally positioned for a different fluid, without the need for a new Initial Makeup procedure (see the Water Calibration addendum in this manual for details).

2-26

Page 66
Image 66
Siemens SITRANS FUS1010 NEMA-4X/ IP 65 manual Install Completed?