Input Calibration
0 to 10 Volts
Refer to Figure
Table 5-8 Set Up Wiring Procedure for 0 to 10 Volts
Step | Action |
|
|
1Connect the copper leads from the calibrator to the Input #1 terminals as shown in Figure
2Place voltage source at zero before switching on.
3Do not switch voltage source ON/OFF while connected to the instrument.
Volt
Source
+ |
| 1 |
| |
|
|
| ||
_ | 100K pair | 2 | 26+ | |
3 | ||||
|
| 27- | ||
|
|
|
Figure 5-6 Wiring Connections for 0 to 10 Volts
Milliamperes
Refer to Figure
Table 5-9 Set Up Wiring Procedure for Milliampere Inputs
Step | Action |
|
|
1Connect the copper leads from the calibrator to the Input #1 terminals as shown in Figure
2Place current source at zero before switching on.
3Do not switch current source ON/OFF while connected to the instrument.
Milliampere + Source
250 ohms
26+
_
27-
Figure 5-7 Wiring Connections for 0 to 20 mA or 4 to 20 mA Inputs
4/07 | UDC2500 Universal Digital Controller Product Manual | 143 |