Input Calibration
5.6 Input 2 Set Up Wiring
0 to 20 mA or 4 to 20 mA Inputs – Input 2
Refer to Figure
Table
Input 2
Step | Action |
|
|
1Connect the copper leads from the calibrator to the Input #2 terminals as shown in Figure
2Place current source at zero before switching on.
3Do not switch current source ON/OFF while connected to the instrument.
Current
+
25+
Source _
26 (no connection)
27-
Copper Leads
Equal Length
Figure 5-8 Wiring Connections for 0 to 20 mA or 4 to 20 mA Input – Input 2
146 | UDC2500 Universal Digital Controller Product Manual | 4/07 |