Efficient Networks S120 Acceptance test and certificate, General information about acceptance

Models: S120

1 560
Download 560 pages 21.93 Kb
Page 325
Image 325

Safety Integrated basic functions 9.8 Acceptance test and certificate

Description of faults and alarms

Note

The faults and alarms for SINAMICS Safety Integrated are described in the following documentation:

References: /LH1/ SINAMICS S List Manual

9.8Acceptance test and certificate

9.8.1General information about acceptance

Acceptance test

The machine manufacturer must carry out an acceptance test for the activated Safety Integrated functions (SI functions) on the machine.

During the acceptance test, all the limit values entered for the enabled SI functions must be exceeded to check and verify that the functions are working properly.

NOTICE

The acceptance test must only be carried out after the safety functions have been commissioned and POWER ON reset.

Authorized person, acceptance report

Each SI function must be tested and the results documented and signed in the acceptance certificate by an authorized person. The acceptance certificate must be stored in the machine logbook.

Authorized in this sense refers to a person who has the necessary technical training and knowledge of the safety functions and is authorized by the machine manufacturer to carry out the test.

Note

The information and descriptions regarding commissioning must be carefully observed.

If any parameters are altered by SI functions, the acceptance test must be carried out again and documented in the acceptance certificate.

Template for the acceptance certificate

A printed form is available in this manual as an example/suggestion.