DVP - ES2/EX2/SS2/SA2/SX2 Operation Manual - Programming

2.Steps:

a)Find the max. and min. coordinates on X and Y axes (0,0), (26000,26000), (34000,18000), (8000,-8000) (as the figure above). Place them respectively in the 32-bit registers (D200,D202), (D204,D206), (D208,D210) and (D212,D214).

b)Select “draw clockwise arc” and default “motion time” (S = D100 = K0).

c)RUN the PLC. Set ON M0 to start the drawing of a tilted ellipse.

 

 

 

=

D0

K1

 

DCIMA

D200

D202

D100

Y0

 

 

 

 

 

 

 

 

 

 

 

=

D0

K2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DCIMA

D204

D206

D100

Y0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

=

D0

K3

 

DCIMA

D208

D210

D100

Y0

 

 

 

 

 

 

 

 

 

=

D0

K4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DCIMA

D212

D214

D100

Y0

 

 

 

 

 

 

 

 

M0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RST

M1029

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DMOV

K0

D1030

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DMOV

K0

D1336

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOV

K0

D100

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOV

K1

D0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M0

M1029

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INCP

D0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

END

3.Operation:

When PLC runs and M0 = ON, PLC will start the drawing of the first segment of the arc. D0 will plus 1 whenever a segment of arc is completed and the second segment of the arc will start to execute automatically. The operation pattern repeats until the fourth segment of arc is completed.

3 - 436

Page 552
Image 552
Delta DVP-ES2/EX2/SS2/SA2/SX2/SE manual Rst