DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory
3-29Release 5/6si to Release 8r
3
For 2 Collocated Expansion Port Networks
1. Behind port carrier D of the multicarrier PPN:
a. Install a lightwave transceiver on the c onnector at slot 1D02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
b. Connect 1 end of the ap propriate fiber op tic cable to the lig htwave
transceiver at slot 1D02.
c. Route the cable to the cabinet’ s cable tray and d own, out of the
cabinet, to the EPN stack.
d. Carefully attach the fiber op tic cable (with c able ties) to the wall of
the cable tray at the built- in cable tie positions.
2. Behind control cabinet A of EPN stack 3:
a. Install a lightwave transceiver on the c onnector at slot 3A01.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
b. Connect the other end of the fib er optic ca ble from the PPN to the
lightwave transceiver at slot 3A01.
c. Carefully attach the fiber op tic cable (with c able ties) to the rear
covers of the EPN stack.
d. Coil the surplus fiber op tic cable an d place it either in the c able
manager or on the bottom shelf (hold ing the power supp ly) of the
PPN cab inet .
3. Behind control cabinet A of EPN stack 2:
a. Install a lightwave transceiver on the c onnector at slot 2A02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
b. Connect a fiber op tic cable to the transc eiver just installed.
c. Route the cable down the outsi de of the rear covers to the other
EPN stack.
d. Carefully attach the fiber op tic cable (with c able ties) to the rear
covers of the EPN stack.