DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-27Install a New EPN Cabinet in an Existing System
6
Interconnect Cabling Release 8r
For more fiber optic cab ling information, refer to

DEFINITY Enterprise

Communications Server Release 8 Installation and Test for Multicarrier Cabinets

.
Switch-Connect New EPN to Existing PPN and
EPN (Standard Reliability)
For the following connection examp le, the PPN cabinet is called Cab inet 1, the
first EPN cabinet is called Cab inet 2, and the EPN cabinet containing the Switc h
Node Carrier is called Cabinet 4.
NOTE:
For the following example, add links to PNs in alternating order, for
example: 20 and 2, 19 and 3 , 18 and 4, and so forth.
1. At the rear of the Port Carrier in position B in Cabinet 1 , install a 9823A
lightwave transceiver onto Slot 2 (1B02). See Figure 6-15.
2. Connect a 20-foot fiber optic cable to the TX and RX connectors on the
transceiver. Label the cab le to make the connections to Cab inet 4 easier.
3. Route the fiber cable to the Port Carrier in p osition E in Cabinet 4.
4. At the rear of the Port Carrier in position E in Cabinet 4, install a 9823A
lightwave transceiver onto Slot 2 (4E02).
5. Connect the 20-foot fiber optic cable from the Port Carrier in Cabinet 1 to
the TX and RX connectors on the transceiver on the Port Carrier in Cabinet
4. Be sure the cable connec ted to the TX connector on 1 transceiver is
connected to the RX connecto r on the other transceiver and vice v ersa.
6. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A
lightwave transceiver onto Slot 1 (2A01).
7. Connect a 20-foot fiber optic cable to the TX and RX connectors on the
transceiver. Be sure to label the c able.
8. At the rear of the Switch Node Carrier in position E in Cab inet 4, install a
9823A lightwave transceiver onto Slot 20 (4E20).
9. Connect the 20-foot fiber optic cable from Cabinet 2 to the TX and RX
connectors on the transceiv er on the Switch Node Carrier in Cabinet 4. Be
sure the cable connec ted to the TX connector on 1 transceiver is
connected to the RX connecto r on the other transceiver and vice v ersa.
10. Connect an H600-278 Metallic Cab le from Slot 1 in the Expansion Control
Carrier in Cabinet 4 (4A01) to Slot 19 on the Switch Node Carrier in
position E in Cabinet 4 (4E19).