DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-34Standard Reliability
5
3. Behind control carrier A of EPN cabinet 2:
Install a lightwave transceiver on c able connector at slot 2A 02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect a fiber optic cable to the transceive r just installed.
Route the cable to the cable tr ay and down, out of the cab inet,
through the cable manag er to the PDS cross-connect facility.
Connect the fiber cab le to the lightguide interc onnect unit provided.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
4. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on c able connector at slot 3A 02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect a fiber optic cable to the transceive r just installed.
Route the cable to the cable tr ay and down, out of the cab inet,
through the cable manag er to the PDS cross-connect facility.
Connect the fiber cab le to the lightguide interc onnect unit provided.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
Coil up the surplus fiber cable and plac e it in the cable manag er.