DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-36Standard Reliability
5
Boot the Release 8 System
1. Connect the PC to the “TERMINAL” connector behind PPN control carrier
“A,” or install the G3-MA ac cording to the “ Set Up G3-MA” chapter of
DEFINITY Communications System Generic 3 Management Applic ations
Operations
.
2. Insert the translation card in the TN794 faceplate.
3. At the EPN power distribution unit, set the main c ircuit breaker to ON.
4. At the PPN power distribution unit, set the main c ircuit breaker to ON.
5. The system performs the reset level 4 rebooting process, loading default
system translations from the translation card. This takes 8 to 11 minutes .
6. Get the order number of the up grade, and c all the regional CSA to request
an “init” login so that the right-to-use options ca n be enabled on the
upgraded s ystem.
7. To use Access Security Gateway (ASG), see Appendix C, ‘‘Access
Security Gateway’’.