Adding or Removing Cabinet Hardware
6-101Add a Switch Node Carrier (Standard Reliabi lity)
6
Figure 6-35. Locations of Top and Bottom Ground Straps on Standard and
Enhanced Carriers
8. If the switch node carrier wa s installed in the “D” p osition of the PPN,
install the TDM/LAN cable (between the “ A” and “D” carriers) to the
pin-field block labeled “TDM/LAN” on the right side of both carriers. See
Figure 6-36 and Table 6-9.
Figure Notes
1. Standard AC-powered Carrier
2. Enhanced Carrier (in R8r PPNs using
either AC power [U.S.] or Glob al
power)
3. Top Ground Straps
4. Bottom Ground Straps