DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-129Add MCC Port Carriers
6
Save Translations
1. Log in at the management terminal.
2. If the system is high- or critic al-reliability, type status spe and press Enter
to verify that the standby SPE is refreshed and that the standb y disk is in
service.
3. Type save translation [spe-a or both] disk and press Enter. This
command instructs the system to take all translation information in
memory and write it to the disk(s).
4. If the MCC port network contains a TN750 Announc ement circuit pac k,
type display announcements and press Enter.
If administered recorded announcements are listed, typ e list
configuration software-version and press Enter. Ch eck screen 2 to find
out when the announcements were last saved.
Save the current announcements by typ ing save announcements and
pressing Enter.
5. Type backup disk [spe-a or both] and press Enter. This command
instructs the system to bac kup the current information on di sk to the
system tape(s).
6. Update back up tape(s), if required .
Shut Down DEFINITY LAN Gateway System
If a DEFINITY LAN Gateway system resides in the control cabinet to be
upgraded, p repare to shut down the DEFINITY LAN Gateway assembly and
allow the disk to completel y spin down.
!CAUTION:
Make sure that you save the system parameters if you p lan to reuse the
current system.
!WARNING:
Neglecting to shut d own a DEFINITY LAN Gateway assembly before
powering down the system c abinet where it resides c an damage the LAN
Gateway disk.
1. Unseat the LAN Gateway assembly from its bac kplane connector s in the
carrier.
2. Log onto the DEFINITY LAN Gateway. S ee the
DEFINITY Communications
System Generic 3 Installation, Administration and Maintenance of
CallVisor ASAI over the DEFINITY LAN Gateway
.
3. When the main menu appears, select
Maintenance
.
4. Select
Reset System
from the
Maintenance
menu.
5. Select
Shutd own
from the
Reset Sys tem
menu.