DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-22Install a New EPN Cabinet in an Existing System
6
Install a New EPN Cabinet in an Existing System
Figure 6-13 shows a typical multicarrier EPN cabinet. Each EPN cabinet is
normally positioned adj acent to the PPN cabinet but may b e located remotely in
a different room or a different building .
Figure 6-13. Typical Multicarrier EPN Cabinet
1. Uncrate and position the c abinet as instructed at the beginning of this
chapter.
2. Install earthquake protec tion as instructed on pag e 1-9.
3
2
PortCarrier "C"
PortCarrier "B"
Control Carrier "A"
Port Car rier "D"
PortCarrier "E"
Fans
PowerDistr ibution
0075_0RBP 08 0196