DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-33Standard Reliability
5
Route the cable to the cable tr ay and down, out of the cab inet,
through the cable manag er to the PDS cross-connect facility.
Connect the fiber cab le to the lightguide interc onnect unit provided .
Carefully attach the fiber cab le (with cable ties) to the wall of the
cable tray at the built-in cable tie positions.
Coil up the surplus fiber cable and p lace it in the cable mana ger.
For Two Fiber-Remoted Expansion Port Networks
1. Behind control carrier A of PPN cabinet 1:
Install a lightwave transceiver on c able connecto r at slot 1A02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect a fiber optic cable to the transc eiver just installed.
Route the cable to the cable tr ay and down, out of the cab inet,
through the cable manag er to the PDS cross-connect facility.
Connect the fiber cab le to the lightguide interc onnect unit provided .
Carefully attach the fiber optic cable (with ca ble ties) to the wall of
the cable tray at the built- in cable tie positions.
2. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on c able connecto r at slot 3A01.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect a fiber optic cable to the transc eiver just installed.
Route the cable to the cable tr ay and down, out of the cab inet,
through the cable manag er to the PDS cross-connect facility.
Connect the fiber cab le to the lightguide interc onnect unit provided .
Carefully attach the fiber optic cable (with ca ble ties) to the wall of
the cable tray at the built- in cable tie positions.
Coil up the surplus fiber cable and p lace it in the cable mana ger.