DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-16Standard Reliability
5
Required Tools
The following tools and items may be req uired during the up grade:
High-intensity flashlight or AC d rop light
3/8-inch flat-blade sc rewdriver with a 10-inch shank (minimum)
5/16-inch and 1/4-inch soc kets with a ratchet and 10-inch extension
Long-nose pliers to disc onnect ground strap s and straighten bac kplane
pins
Static-proof or original circ uit pack pac kaging for transporting circuit
packs
Labels for identifying the p ort circuit pac ks and cables attac hed to the
rear of cabinets
Twelve spare #12 and #10 self-tapping s crews
Four spare carrier ground strap s
Wrist ground strap
Repair kit for backplane pins (KS-22876 L2 or equivalent)
One copy of each of the foll owing manuals:
DEFINITY Enterprise Communications Server Release 8 Maintenance for R8si or DEFINITY Enterprise Communications
Server Release 8 Maintenance for R8r
DEFINITY Enterprise Communications Server Release 8
Administrator’s Guide
Follow Routine Preventive Maintenance
During the upgrad e, follow routine preventive maintenance p rocedures on the
system to be upgrad ed. For information about the proc edures and necessary
equipment, refer to the “Preventive Maintenanc e” section in
DEFINITY Enterprise
Communications Server Release 8 Maintenance for R8r
.
Label Cables
To make reconnecting the cables simp ler and more reliable, label b oth ends of
the connector cab les associated with the carrier to b e removed.