DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-83Critical Reliability
5
Figure 5-24. Location of P1 and P2 Connectors
Prepare the New A and B Position Carriers
1. Inspect the new carriers for a ny damage. Verify that the backp lane pins
are not bent.
2. Place the expansion control carrie r on the floor so that the rear of the
carrier faces up.
3. Install the CFY1 current limiter (CURL) on the “A” carrier to the p in-field
block marked “ CURL.” The CURL is inserted with the componen ts on the
left side as viewed from the rear.
4. At the rear connector panel, d etermine which connec tors will have a cable
attached, and install a 4B cable retainer on each of these c onnectors.
Figure Notes
1. Rear of Control Carrier
2. P2 Connector
3. P1 Connector