DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory
3-10Release 5/6si to Release 8r
3
Release 5/6si to Release 8r
During the wiring of the PPN installation, label the MDF with the new PN number
of the Release 5/6si PPN. The ST S software upgrade assigns the next PN number
(after the highest numbered PN in the Release 5/6si system) to the upgraded
Release 8r EPN.
Required Tools
The following tools and items may be req uired during the up grade:
■1/4-inch flat blade sc rewdriver
■1/4-inch socket with ratchet ( optional)
■Long-nose pliers to straighten backplane p ins
■Static-proof or original circ uit pack pac kaging for transp orting circuit
packs
■Labels for identifying the p ort circuit p acks and cab les attached to the
rear of cabinets
■Repair kit for backplane pins (KS-22876 L2 or equivalent)
■One copy of each of the foll owing manuals:
— DEFINITY E nterprise Communications Server Release 8
Maintenance for R8r
— DEFINITY E nterprise Communications Server Release 8
Administrator’s Guide