DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-94Critical Reliability
5
6. Behind control carrier A of EPN cabinet 3:
■Install a lightwave transceiver on c able connector at slot 3A 02.
■Connect the other end of the fib er optic cable to the lightwave
transceiver, just installed, at slot 3A02.
■Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
■At the top of the cabinet, c oil the surplus fiber op tic cable, and
carefully attach the coil to the wall of the cable tray.
7. Behind port c arrier B of EPN cabinet 2:
■Install a lightwave transceiver on c able connector at slot 2B 03.
■Connect 1 end of the fiber optic cable to the lightwave transc eiver,
just installed, at slot 2B03.
■Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
8. Behind port c arrier B of EPN cabinet 3:
■Install a lightwave transceiver on c able connector at slot 3B 03.
■Connect the other end of the fib er optic cable to the lightwave
transceiver, just installed, at slot 3B03.
■Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
■At the top of the cabinet, c oil the surplus fiber op tic cable, and
carefully attach the coil to the wall of the cable tray.