Multicarrier G2 Universal Module to R8r EPN
5-94Critical Reliability
5
6. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on c able connector at slot 3A 02.
Connect the other end of the fib er optic cable to the lightwave
transceiver, just installed, at slot 3A02.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
At the top of the cabinet, c oil the surplus fiber op tic cable, and
carefully attach the coil to the wall of the cable tray.
7. Behind port c arrier B of EPN cabinet 2:
Install a lightwave transceiver on c able connector at slot 2B 03.
Connect 1 end of the fiber optic cable to the lightwave transc eiver,
just installed, at slot 2B03.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
8. Behind port c arrier B of EPN cabinet 3:
Install a lightwave transceiver on c able connector at slot 3B 03.
Connect the other end of the fib er optic cable to the lightwave
transceiver, just installed, at slot 3B03.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
At the top of the cabinet, c oil the surplus fiber op tic cable, and
carefully attach the coil to the wall of the cable tray.