DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Upgrading G3rV2, V3, V4 to R8r and Adding Memory
1-14Upgrade the software and hardware
1
Figure 1-3. Do not touch the disk inside the cartridge.
Power Up the Processor Carrier
1. To restore power to the processor carrier, insert the power plug on the
right side
of the carrier then insert the power p lug on the

left side

of the
carrier.
If high or critical reliab ility:
2. Mon itor t he SPE as i t reb oots by ob ser ving the LED s and the t ermin al. I t is
powered up when the YELLOW LED on the Processor circuit pac k blinks
in a steady state, which takes ab out 10 minutes.
Unlock the Active SPE (H/C only)
1. Move the SPE SELECT switches to the AUTO position
one at a time
.
2. Wait 10 minutes.
!CAUTION:

Allow 10 minutes after unlocking to make sure the standby SPE has

fully returned to service.

640
MB
2048
BYTES/SECTOR
h1dfdsk1 KLC 091799