What’s New in Release 8.2r
xiii
Upgrade tips
The following upgrade tip s were generated from prob lems identified in the
laboratory or during early introduction.
Adding a third memor y circuit pack and an optical drive requires a sec ond
non-call-preserving servic e interruption. See Chapter 1, ‘‘Upgr ading
G3rV2, V3, V4 to R8r and Adding Memory’’.
When upgrading a DEFINITY ECS R8r to a duplicated system (B c arrier)
or adding a switc h node carrier (D carrier), you may receive a carrier that
looks different than the ones currently installed . The enhanced carriers
come with 16 grounding straps that connect to the c arrier connector
panel. See ‘‘Add a Control Carrier (Add Duplication )’’ on page 6-80, ‘‘Add
a Switch Node Carrier (Standard Reliability)’’ on p age 6-94, and ‘‘Add a
Switch Node Carrier (High or Critic al Reliability)’’ on page 6-108.
NOTE:
An enhanced carrier is u sed only in an R8r PPN cabinet that uses
either AC power (U.S.) or Global power.
Cautions and warnings
The following new cautions and warning s were generated from prob lems
affecting possib le data loss that were identified in the lab oratory or during early
introduction.
Procedure Caution or Warning
Unloc k the A ctiv e SPE
(H/C only) !CAUTION:

Allow 10 minutes after unlocking to make sure the stand by

SPE has fu lly ret urned to ser vice .

Upgrade Software !CAUTION:

All calls are dropp ed—this is a service interrup tion