DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-119Add a Switch Node Carrier (High or Critical Reliability)
6
Interconnect Port Networks
1. Behind the PPN cabinet (See Figure 6-37):
a. Connect the metallic intrac arrier cable between sl ots 1E01 and
1E02.
b. Connect the metallic intracarrier cable b etween slots 1D01 and
1D02.
2. Behind switch nod e carrier E of PPN cabinet 1 (See Figure 6-37):
a. For each EPN, install one 9823-type lightwave transc eiver on the
following order of slots: 1E20, 1E03, 1E19, 1E04, 1E18, 1E05, and
so forth.
b. Connect 1 end of eac h fiber optic c able to each lightwave
transceiver, just installed.
c. Carefully attach the fiber op tic cables (with c able ties) to the wall of
the cable tray at the built- in cable-tie positions.
3. Behind control carri er A of each EPN cabinet:
a. Install a lightwave transceiver on slot A01.
b. Connect the other end o f the fiber optic cab le to the lightwave
transceiver, just installed.
c. Carefully attach the fiber o ptic cable (with c able ties) to the wall of
the cable tray at the built- in cable-tie positions.
d. Coil up the surplus leng th of fiber optic c able, and carefully attac h
the coil to the wall of the cable tray.
4. Behind switch nod e carrier D of PPN cabinet 1 (See Figure 6-37):
a. For each EPN, install a lightwave transceiver on the following order
of slots: 1E20, 1E03, 1E19, 1E04, 1E18, 1E05, and so forth.
b. Connect 1 end of eac h fiber optic c able to each lightwave
transceiver, just installed.
c. Carefully attach the fiber op tic cables (with c able ties) to the wall of
the cable tray at the built- in cable-tie positions.
5. Behind port c arrier B of each EPN cabinet:
a. Install a lightwave transceiver on slot B02.
b. Connect the other end o f the fiber optic cab le to the lightwave
transceiver, just installed.
c. Carefully attach the fiber o ptic cable (with c able ties) to the wall of
the cable tray at the built- in cable-tie positions.
d. Coil up the surplus leng th of fiber optic c able, and carefully attac h
the coil to the wall of the cable tray.