DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-58High Reliability
5
For Two Collocated Expansion Port Networks
1. Behind control carrier A of PPN cabinet 1:
Install a lightwave transceiver on the c able connector at slot 1A 02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect a fiber optic cable to the transceiver jus t installed.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
2. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on the c able connector at slot 3A 01.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect the other end of the fib er optic cable to the li ghtwave
transceiver just installed.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
At the top of the cabinet, c oil up the surplus fiber optic cable and
attach it to the wall of the cable t ray.
3. Behind control carrier A of EPN cabinet 2:
Install a lightwave transceiver on the c able connector at slot 2A 02.
Connect a fiber optic cable to the transceiver jus t installed.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
4. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on the c able connector at slot 3A 02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect the other end of the fib er optic cable to the transceiver just
installed.
Carefully attach the fiber optic cable (with cab le ties) to the wall of
the cable tray at the built- in cable tie positions.
At the top of the cabinet, c oil up the surplus fiber optic cable and
attach it to the wall of the cable t ray.