DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-115Add a Switch Node Carrier (High or Critical Reliability)
6
Figure 6-40. Locations of Top and Bottom Ground Straps on Standard and
Enhanced Carriers
8. If a switch node carrier is being installed in th e “D” position of the PPN,
install the TDM/LAN cable (between the “ E” and “D” c arriers) to the
pin-field bloc k marked “TDM/LAN” on the rig ht side of both carriers . See
Figure 6-41 and Table 6-10.
Figure Notes
1. Standard AC-powered Carrier
2. Enhanced Carrier (in R8r PPNs using
either AC power [U.S.] or Glob al
power)
3. Top Ground Straps
4. Bottom Ground Straps
P1 P1
1 2
lcdfgrn2 KLC 022100
G9
G9
G10
00
01
TDM/
LAN
ICCA
ICCB
02
03
04
G1
G2
7
8
10
111
32
4
5
6
3
4
3
4