DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-57High Reliability
5
For Either 1 or 2 Collocated Expansion Port Networks
1. At control carrier A of PPN cabinet 1 (see Figure 5-15 through Figure
5-18):
Install a lightwave transceiver on the c able connector at slot 1A01.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect a fiber optic cable to the transc eiver just installed.
Carefully attach the fiber optic cable (with ca ble ties) to the wall of
the cable tray at the built- in cable tie positions.
2. Behind control carrier A of EPN cabinet 2:
Install a lightwave transceiver on the c able connector at slot 2A01.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
Connect the other end of the fib er optic cab le to the transceiver just
installed.
Carefully attach the fiber optic cable (with ca ble ties) to the wall of
the cable tray at the built- in cable tie positions.
At the top of the cabinet, c oil the surplus of fiber op tic cable and
carefully attach the coil to the wall of the cable tray.