DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115 Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-106Critical Reliability
5
Remove Power-Failure Ground Strap
Remove the ground strap from the power- failure transfer unit.
Boot the Release 8 System
1. Connect the management terminal to the “TERMINAL” connector behind
PPN control carrier “A,” or install the G3-MA ac cording to the “ Set Up
G3-MA” chapter of

DEFINITY Communications System Generic 3

Management Applications

Operations

, 585-229-202.
2. Insert the translation cards in the TN794 fac eplates.
3. At each EPN power distribution unit, set the main circuit breaker to ON.
4. At the PPN power distribution unit, set the main c ircuit breaker to ON.
5. The system performs the reset level 4 rebooting process, loading the
default system translations from the translation ca rds. This takes 8 to 11
minutes.
6. Get the order number of the upg rade and call the regional CSA to request
an “init” login so the rig ht-to-use options can b e enabled.
7. To use Access Security Gateway (ASG), see Appendix C, ‘‘Access
Security Gateway’’.