PIONEERPOS manual +MPCMC, Continuous PCM Clock, April 15 G24-L AT Commands Reference Manual 153

Models: G24-LC G24-L

1 444
Download 444 pages 51.67 Kb
Page 217
Image 217

Chapter 3: AT Commands Reference

+MMAD:1,160

//Operation not allowed because the parameters are valid but the there is not enough time for calculation:

AT+MMAD =1,3,100, , ,7,1,5 // Activate Average calcluation during 1 minute, rate=100, // samples = 7, report interval = 5 sec.

//converter num=1, report=3, rate=100, low,high, 7,

//duration=1 min, interval = 5.

+CME ERROR: operation not allowed

AT+MMAD =1,0

// Stop Average calcluation and report.

OK

// converter num=1, report=0

AT+MMAD?

// Read monitoring setup values of all A2D's

+MMAD:1,0,10,0,230,0,0,0

 

+MMAD:2,1,15,0,230,0,0,0

 

+MMAD:3,2,1,25,100,0,0,0

 

+MMAD:5,0,1,300,450,0,0,0

 

OK

 

AT+MMAD?

// Read default values of all A2D's

+MMAD: 1,0,1,0,230,0,0,0

 

+MMAD: 2,0,1,0,230,0,0,0

 

+MMAD: 3,0,1,0,230,0,0,0

 

+MMAD: 5,0,1,300,450,0,0,0

 

OK

 

AT+MMAD=?

//Test command - range of all setup parameters and

+MMAD: (1-3,5),(0-3),(1-255),(0-450),(0-450),(2-255),(1-255),(0-255)

OK

+MPCMC, Continuous PCM Clock

This command defines whether the PCM clock is generated continuously or not, when module is in digital audio mode (configured by AT+MADIGITAL command).

Note: User is advised not to enable sleep mode feature if he wants to use continuous PCM clock feature. Otherwise PCM clock will not work correctly while module is in deep sleep mode.

April 15, 2008

G24-L AT Commands Reference Manual

3-153

Page 217
Image 217
PIONEERPOS G24-LC manual +MPCMC, Continuous PCM Clock, April 15 G24-L AT Commands Reference Manual 153