
192CHAPTER 20: VRRP CONFIGURATION GUIDE
Networking and
Configuration
Requirements
■There are two switches, the master and the backup, in VRRP group 1.
■The IP addresses of the master and the backup are 10.100.10.2 and 10.100.10.3 respectively.
■The master is connected with the upstream network through port Ethernet 1/0/1 that belongs to VLAN 2, and is connected with a Layer 2 switch through Ethernet 1/0/2 that belongs to VLAN 3.
■The virtual IP address of the VRRP group is 10.100.10.1.
■Enable the port tracking function on Ethernet 1/0/1 of the master and specify that the priority of the master decreases by 50 when Ethernet 1/0/1 fails, which triggers a new master election in VRRP group 1.
■On the backup, the configurations related to the upstream and downstream device connection, and the configurations related to the VRRP group have been finished. The configuration procedures are omitted here.
Applicable Products
Product series | Software version | Hardware version |
|
|
|
Switch 5500 | Release V03.02.04 | All versions |
Switch 5500G | Release V03.02.04 | All versions |
|
|
|
Configuration Procedure Perform the following configurations on the master:
# Enter system view
<3Com>
# Create VLAN 2.
[3Com] vlan 2
# Configure VLAN-interface 2.
[3Com] interface
# Create VLAN 3.
[3Com] vlan 3
# Configure
[3Com] interface