SYSTEM MAINTENANCE

5.3 MIS FAULT RECOVERY PROCEDURES

This paragraph describes the fault recovery procedures related to the MIS in the order shown below.

1.MIS Restart Processing

Step 1: By selecting MIS System Stop, cause the MIS to cease operating.

Step 2: Turn off the power supply to the MIS. After 5 ~ 6 seconds, turn on the power supply again.

Step 3: The MIS starts up.

Step 4: Perform operation tests of the MIS.

2.Check on Connection Cables

Check to see if the cable is connected between the MIS and the NEAX2400 IMX.

CHAPTER 9

NDA-24282 (E)

Page 452

 

Revision 1.0

 

Page 471
Image 471
NEC 2400IMX system manual System Maintenance MIS Fault Recovery Procedures