18

Page 13 of 456

List of Procedures

Procedure 1

Preparing the equipment for installation . . . . . . . . . . . . . . . . . . . . . 62

Procedure 2

Placing the fourth module on a column . . . . . . . . . . . . . . . . . . . . . . 66

Procedure 3

Positioning and leveling the equipment . . . . . . . . . . . . . . . . . . . . . . 71

Procedure 4

Installing safety ground/protective earth and logic return wiring . 82

Procedure 5

 

Installing the UPS ground cabling

86

Procedure 6

Installing the overhead cable tray kits . . . . . . . . . . . . . . . . . . . . . . . 90

Procedure 7

Installing and connecting the power plant frame ground leads . . . 113

Procedure 8

Installing safety ground/protective earth wiring . . . . . . . . . . . . . . . 123

Procedure 9

Connecting power from the power plant to the PDU (NT4N49AA) . 125

Procedure 10

Connecting UK power to the Four-Feed PDU . . . . . . . . . . . . . . . . . 129

Procedure 11

Installing the BIX cross-connect terminal . . . . . . . . . . . . . . . . . . . . 135

Procedure 12

Installing the Krone Test Jack Frame (UK) . . . . . . . . . . . . . . . . . . . . 138

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning

Page 13
Image 13
Nortel Networks 1000M warranty List of Procedures