
Cabling Common Equipment in a Multi Group system Page 217 of 456
Figure 89
Card placement in the NT4N41Core/Net Module
Net
Core
PS
NT8D17 Conference/TDS Card
NT8D04 Superloop Network Card
NT8D04 Superloop Network Card
NT8D04 Superloop Network Card
NTRB33 Fiji
CardSignalingPeripheral |
| cCNI | SYS | CP |
|
| UTIL | PIV |
| ||
|
| ||||
A |
|
|
| ||
|
| B | Enb | C |
|
|
|
|
| ||
|
| Enb |
|
|
|
|
| Dis | Dis |
|
|
|
|
| C |
| |
|
|
|
|
| |
|
|
|
| LAN 1 | LAN 2 |
|
|
|
| USB |
|
|
|
|
| L |
|
|
|
|
| L |
|
|
|
|
| COM 1 | COM 2 |
|
|
|
| U |
|
|
|
|
| INIT |
|
QPC43R | QPC441 |
|
| RESET |
|
|
|
|
|
PS | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 |
| c9 c10 c11 c12 c13 c14 c15 CP |
Required Core cables
Table 28 on page 217 lists field installed cables. Cables in Table 29 on page 218 are factory installed.
Table 28
Field installed Core cables (internal) (Part 1 of 2)
|
| Number required |
Order Code | Description | per system |
|
|
|
NT4N88AA | COM1 (DTE/terminal) | 1 |
NT4N88BA | COM2 (DCE/modem) | 2 |
NT4N90BA | Ethernet (CP PIV card to I/O panel) | 2 |
NTRC17BA | Crossover Ethernet cable (Core to Core) | 2 |
|
|
|
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning