Introduction Page 33 of 456

Summary of procedures

1Prepare equipment for installation; go to “Preparing the equipment for installation” on page 62.

2Place the fourth module on a column (if required); go to “Placing the fourth module on a column” on page 65.

3Position and level equipment; go to “Positioning and leveling equipment” on page 71.

Note: If earthquake bracing is required, go to “Installing earthquake bracing” on page 343. The section will provide procedures for installing column and floor bracing and positioning and levelling equipment. When those procedures are complete, return to Step 4 or Step 5 (as applicable) in this summary.

4Install overhead cable tray kits (if required); go to “Installing overhead cable tray kits” on page 89.

5Install power supplies in all modules:

a Make sure the system is disconnected from any power source.

b Set switches and breakers on all module power supplies or module power distribution units (MPDU) to OFF.

c Insert each power supply into the appropriate card cage and hook the locking devices.

6Install a NT4N39AA CP PIV Processor Pack and blank faceplate (N0026096) to cover MMDU slot

7Install power equipment and ground wiring:

For AC-powered systems, go to “Installing AC power” on page 77.

For DC-powered systems, go to “Installing DC power” on page 93.

8Plan and designate the main distribution frame (MDF); go to “Planning and designating a Main Distribution Frame” on page 133.

9Install Power Failure Transfer Units (PFTU) (if required); go to “Installing Power Failure Transfer Units” on page 145.

10Configure the system monitor; go to “Configuring the system monitor” on page 151.

Communication Server 1000M and Meridian 1 Large System Installation and Commissioning

Page 33