Positioning and leveling equipment
Contents
This section contains information on the following topic:
Positioning and leveling the equipment | 71 |
Positioning and leveling the equipment
Columns normally stand on adjustable feet that provide leveling capability and ground isolation. However, casters are available and can be used for
Note: If earthquake bracing is required, go to “Installing earthquake bracing” on page 343 to install column and floor bracing, and to position and level equipment. When those procedures are complete, return to Step 4 or Step 5 (as applicable) in the initial installation procedure.
Use Procedure 3 to position and level the equipment.
Procedure 3
Positioning and leveling the equipment
1Check the equipment room floor plan to position columns.
2Level the column.
a.Remove the front and rear exhaust grills.
b.Remove the front and rear air intake grills.